American Electric Power (AEP) Cardinal Power Plant Flue Gas Desulfurization
Industrial | Clean Power, Energy, Power Plant
Industrial
Clean Power, Energy, Power Plant
Project Overview
American Electric Power (AEP) installed a Flue Gas Desulfurization (FGD) system at its Cardinal Power Plant in Southeastern Ohio to reduce sulfur dioxide emissions from coal power generation.
Baker was contracted for all structural concrete elements, including pedestals, piers, foundations, walls, paving, and elevated decks. Baker also oversaw the mechanical and electrical scopes of work.
The project included challenging riverbank work, with some pits located 15 feet below the river’s elevation. Baker implemented a comprehensive quality control program, conducting extensive pre- and post-pour inspections with the client, which helped prevent costly rework. Under Baker’s supervision, the project achieved 123,000 man-hours worked without a recordable injury.
Client
Black & Veatch International Co.
Location
Brilliant, OH
Size
40,000 CY
Completion
2007